Changing tyres, replacing the oil filter and checking the hydraulic system on your K93 mini digger are all set out in this 62-page Dingo K93 operation, maintenance and parts manual PDF, which also covers the All Rounder and All Wheel Drive versions. Hydraulic schematics show the pipe layouts for petrol and Perkins engine configurations, while exploded views break down the chassis, fuel tanks, lift arms, main valve, rams, wheel motors and the Kohler, Vanguard, Yanmar and EFI engine assemblies. Pre-start checks, cylinder locks and trailer tie-downs are included too. Plan on 60 L when refilling the hydraulic reservoir, and check auxiliary relief against 3200 psi (220 bar). If your K93 is overheating or vibrating abnormally, the troubleshooting chart lists those faults with starter, engine power and machine drive problems. Bookmarks jump straight to the tyre section, so the wheel nuts go back on at 85 ft-lb (115 Nm), Dingo's own figure.
What's Inside This Manual
| System | Pages | Key Topics |
|---|
| Safety | 4-7 | Children, Service, Safety and Instruction Decals |
| Specifications | 8-9 | Engine, Performance, Hydraulic Pumps, Wheel Motors, Dimensions, Warranty |
| Chassis and Fuel Tank Assemblies | 10-14 | Chassis, 20L Fuel Tank, 25L Fuel Tank |
| Hydraulic Arms and Auxiliary Valve Parts | 15-17 | Lift Arms, Pins and Bushes, Auxiliary Valve Parts |
| Dash and Main Valve Components | 18-20 | Dash Parts, Main Valve Parts |
| Rams, Tank Top, and Wheel Motor Assemblies | 21-25 | Hydraulic Rams, Tank Top Parts, Wheel Motor, Mount Plate |
| Mount Plate and Engine Assemblies | 26-36 | Mount Plate, EFI Engine Assembly, Kohler Petrol Engine, Vanguard Petrol Engine |
| Pipe Configurations and Track Assembly | 37-48 | Petrol Pipe Configuration, Yanmar Engine Parts, Perkins Pipe Configuration, Track Full Assembly |
| Operation – Pre Start Up (Daily) | 49-50 | Machine, Operator, Work Area, Adding Fuel, Checking the Engine, Remove Debris From the Machine, Tyres and Traction |
| Operating Instructions | 51-53 | Control Levers / Control Panel, Starting the Engine, Stopping the Engine, Stopping the Dingo, Moving a Non Functioning Dingo, Using Cylinder Locks |
| Attachments | 54 | Connecting, Disconnecting |
| Transporting and Securing | 55-56 | Trailer Attachment, Ramps, Attachment Positioning, Weight Distribution, Tie Down Points, Manual Breaking System |
| Troubleshooting | 57 | Starter, Engine Starting, Engine Power |
| Warranty Statement | 58-62 | Material Defects, Workmanship, Replacement Parts, Engine Policy, Battery Policy, Warranty Exclusions |
Quick Reference Specifications
| Specification | Value | Page |
|---|
| Hydraulic reservoir capacity | 60 L | p. 9 |
| Relief pressure (AUX) | 3200 psi (220 bar) | p. 8 |
| Battery Cable (Positive) | 690mm | p. 31 |
| Battery Cable (Negative) | 250mm | p. 31 |
| Wheel nut torque | 85 ft-lb / 115 Nm | p. 49 |
| Hydraulic Output | 47 L/m | p. 8 |
| Max Travel Speed | 7km/h | p. 8 |
| Wheel Nuts Torque | 85flb/115nm | p. 49 |
| Tyre Pressure | 25-35psi | p. 50 |
| Battery Voltage | 12v | p. 57 |