All 142 pages of this International 435 service manual PDF are built around one job: keeping your 435 or 445 Pickup Baler running, from the PTO shaft and flywheel through the gearbox, packer crank, plunger assembly, and into the knotter and Lok Twist twisting mechanism. Inside: a full section of high-quality exploded views covering every major subassembly, system diagrams for the tying and twisting mechanisms, and detailed torque data with clearance specs for gearbox bearings, packer shafts, and wheel hubs. Set gearbox pinion shaft preload to 288-403 kgm (25-35 lbft) and hold disc drive shaft end float to 0.13-0.38 mm; those factory numbers are in here with full context. Your knotter's dropping twine and hay's still in the field. Bookmarked and searchable; open it on your phone, jump straight to the knotters section, and get wrenching.
What's Inside This Manual
| System | Pages | Key Topics |
|---|
| General | 3-14 | Inspection and Repair, Lubrication, Bolt Identification, Torque Data, Principles of Baler Operation, Specifications |
| Hitch, PTO Shafts and Flywheel | 15-28 | Jack, Hitch, PTO Shafts, Universal Joints, Flywheel and Clutch |
| Gearbox | 29-44 | Gear Box, Pinion Bearing Preload, Pinion Mounting Distance, Crankshaft Bearing Preload, Bevel Gear Backlash, Tooth Contact Pattern |
| Packer Fingers and Crank | 45-60 | Packer Drive Shaft, Packer Fingers and Bearing, Packer Crank |
| Plunger and Bale Chamber | 61-74 | Plunger Pitman, Plunger, Bale Chamber |
| Pickup, Auger and Drives | 75-98 | Pickup, Remote Control Pickup Lift Attachment, Auger and Auger Drive |
| Mainframe, Wheels and Sheet Metal | 99-106 | Wheels and Hubs, Mainframe, Cross Conveyor |
| Tying and Twisting Mechanism | 107-142 | Knotters, Knotter Drive Shaft, Needle Mechanism, Bale Length Control, Lok Twist Twisters, Twister Drive Shaft |
Quick Reference Specifications
| Specification | Value | Page |
|---|
| Disc drive shaft end float | 0.13 to 0.38 mm (0.005 to 0.015 in) | p. 14 |
| PTO Shaft securing bolt torque | 4.75 to 5.2 kgm (34 to 38 lbft) | p. 10 |
| Hub retaining nut torque | 21 to 41.5 kgm (150 to 300 lbft) | p. 10 |
| Gearbox pinion shaft preload | 288 to 403 kgm (25 to 35 lbft) | p. 11 |
| Packer drive shaft backlash | 0.25 to 1.8 mm (0.010 to 0.070 in) | p. 12 |
| Plunger runner to lower wearing pad clearance | 0 to 1.5 mm (0.060 in) | p. 13 |
| Pickup slip clutch torque | 15 to 16.5 kgm (110 to 120 lbft) | p. 11 |
| Knotter disc drive shaft end float | 0.13 to 0.38 mm (0.005 to 0.015 in) | p. 13 |
| Twine tension | 0.45 to 0.91 kg (1 to 2 lb) | p. 14 |