Doosan DX19 Shop Manual

$19.95

Model: DX19
Type: Compact Excavator
Serial: DBMB3Y8AVF0E11001 and up
648 Pages·112 MB·Searchable PDF·English·Print-Ready
  • Torque Specs
  • Multi-Level Bookmarks (2-level navigation)
Preview Sample Pages (PDF)
Doosan DX19 excavator machine dimensions diagram showing side, top, and rear views with standard and long arm specs.
Doosan DX19 Shop Manual $19.95

Instant Download 24/7

  • Works on PC, Mac, tablet, and phone.
  • Download once, keep forever

 

Guaranteed Safe Checkout
Visa Mastercard PayPal Apple Pay Google Pay

Every one of the 648 pages in this Doosan DX19 Shop Manual PDF (OEM #7278164EN) covers a single machine: your DX19 compact excavator. Inside: step-by-step teardown and reassembly for the boom, arm, swing, bucket, and blade cylinders, plus control valve disassembly, piston and gear pump service, and travel and swing motor repair. You also get a full engine section (cylinder head, crankshaft, camshaft and timing gears), electrical coverage from battery to starter, undercarriage maintenance, and a dedicated specifications chapter. Set the hydraulic pump plug between 30 and 34 N-m, then pull the track roller bolts down to 190 to 210 N-m (140 to 155 ft-lb). Your excavator is dead in the yard and the forums are guessing. Bookmarked chapters and a real text layer let you jump straight to the right spec and get wrenching.

What's Inside This Doosan DX19 Manual

SystemPagesKey Topics
Safety & Maintenance3-88Maintenance Safety, Lifting and Blocking the Excavator, Operator Cab
Hydraulic System Information and Cylinders (Boom, Arm, Boom Swing)89-120Hydraulic Symbols, Troubleshooting, Boom Cylinder, Arm Cylinder, Boom Swing Cylinder
Cylinders (Bucket, Blade, Track Frame Expansion) and Valves121-162Bucket Cylinder, Blade Cylinder, Track Frame Expansion Cylinder, Main Relief Valve, Port Relief Valve
Hydraulic Control Valve and Hydraulic Pump163-254Control Valve Disassembly, Control Valve Assembly, Piston Pump, Gear Pump, Torque Adjustment
Manifold, Accumulator, Travel Motors, and Swivel Joint255-320Manifold Assembly, Accumulator, Single Speed Travel Motor, Two Speed Travel Motor, Swivel Joint
Swing Motor, Control Levers, and Hydraulic Components321-366Swing Motor, Joystick Controls, Hydraulic Filter Mount, Hydraulic Reservoir, Oil Cooler
Undercarriage367-396Blade, Track Undercarriage Components, Track Maintenance
Upperstructure & Swing397-484Upperstructure, Cab, Left Console, Engine Speed Control
Electrical System485-528Battery, Alternator, Starter, Lights
Engine529-604Engine Information, Cylinder Head, Crankshaft and Pistons, Camshaft and Timing Gears
Heating and Ventilation605-620Heater System, Regular Maintenance, Heater Unit, Heater Coil
Specifications621-646Excavator Specifications

Quick Reference Specifications

SpecificationValuePage
Fuel filter storage limit3 monthsp. 49
Hydraulic pump plug torque30 - 34 N•m (22 - 25 ft-lb)p. 60
Nut torque1152 N•m (850 ft-lb)p. 110
Head torque373 N•m (275 ft-lb)p. 110
Track roller bolt torque190 - 210 N•m (140 - 155 ft-lb)p. 380
Drive sprocket bolt torque108 N•m (80 ft-lb)p. 380
Track clearance8,3 - 13,5 mm (0.33 - 0.53 in)p. 374
Rubber track sag8 - 13 mm (0.33 - 0.53 in)p. 375
Terminal clamp nut torque7 N•m (5 ft-lb)p. 494
Electrolyte level13 mm (0.50 in)p. 493
O-ring Face Seal Tightening Torque (1/4" Tubeline)18 N•m (13 ft-lb)p. 635
O-ring Face Seal Tightening Torque (3/8" Tubeline)30 N•m (22 ft-lb)p. 635

Doosan DX19 Common Problems This Manual Covers

Doosan DX19 hydraulic system loses power, bucket and arm cycle slow under load

Check hydraulic oil level first; the system holds 19.0 L including the reservoir. Test the main relief valve at the manifold, then test boom and arm cylinders for internal leakage. If the pump is worn, replace it and torque the mounting bolts to 105-115 N•m (78-85 ft-lb) per page 217.

Manual Section: Hydraulic Control Valve and Hydraulic Pump p. 217
Engine overheats within an hour in dusty conditions, temperature gauge climbing into the red

Shut down and let the engine cool, then blow compressed air through the radiator core from the fan side to clear silica dust. Drain and refill the cooling system with 3.3 L of fresh coolant if contaminated. Inspect the water pump for shaft play and seal weeping; engine service coverage starts on page 529.

Manual Section: Engine p. 529
Starter clicks but the engine won't crank, battery terminals covered in white corrosion

Remove both cables, clean the terminals with a wire brush and baking soda solution, then reinstall and torque the clamp nuts to 7 N•m (5 ft-lb) as shown on page 494. Check electrolyte level; it should sit 13 mm above the plates. Load test the battery against its 530 CCA rating and replace if weak.

Manual Section: Electrical System p. 494
Rubber tracks derail on side slopes and tension adjuster bolts keep backing off

Measure track sag midway along the top run and adjust the tensioner until sag falls within 8-13 mm per page 375. Inspect track rollers and idlers for flat spots and wobble. Retorque the track roller bolts to 190-210 N•m (140-155 ft-lb) and add thread locker if they loosened before.

Manual Section: Undercarriage p. 375
Hydraulic hoses weep at the fittings after a year, oil misting on the boom

Wipe the fitting dry and trace the leak with a piece of cardboard, never your bare hand. Replace the hose if the crimp is leaking; if the fitting itself weeps, retorque O-ring face seals to spec, 18 N•m for 1/4 inch tubelines and 54 N•m for 1/2 inch, using the chart on page 635.

Manual Section: Specifications p. 635

Frequently Asked Questions

What are the torque specifications for the boom pivot bolt on the Doosan DX19?

The boom pivot bolt and nut assembly is secured to the pin boss. After the lock nut is installed, the bolt should be free to spin, and the assembly is not tightened to a specific torque value against the pin boss. p. 75

What is the correct valve clearance for the intake and exhaust valves on the DX19 engine?

The valve clearance for both intake and exhaust valves must be checked and adjusted when the engine is cold. The correct clearance is 0,145 - 0,185 mm (0.0057 - 0.0073 inch). p. 572

What is the engine oil pressure specification at rated rpm for the DX19?

The engine oil pressure at rated rpm should be between 200 and 400 kPa (2 - 4 bar) (28 - 64 psi). If the pressure is less than the allowable limit of 100 kPa (1 bar) (21 psi), you should check for issues such as an insufficient oil level or a defective oil pump. p. 559

What is the correct fuel tank capacity for the DX19?

The fuel tank capacity for the DX19 is 19,0 L (5.0 U.S. gal). p. 629

What is the procedure for checking the track tension on the DX19?

To check track tension, raise the side of the machine approximately 102 mm (4 in) using the boom and arm. Measure the clearance at the middle track roller; the correct track clearance is 8,3 - 13,5 mm (0.33 - 0.53 in). p. 374

What do I get after purchasing this Doosan DX19 manual?

Instant PDF download. You get the full 648-page searchable Shop Manual immediately after payment. Open it on your laptop, tablet, or phone right in the shop.

Are there any print restrictions on this Doosan DX19 manual?

Yes, print as many copies as you want, and there are no restrictions. Many mechanics print the section they need and bring it to the shop floor.

BrandDoosan
ModelDX19
Machine TypeCompact Excavator
Manual TypeShop Manual
LanguageEnglish
FormatSearchable PDF (Digital Download)
Pages648
File Size112 MB
Manual No.7278164EN
Serial RangeDBMB3Y8AVF0E11001 and up
Wiring DiagramsNo
Hydraulic SchematicsNo
Torque SpecificationsYes
Bookmarked / IndexedYes

Reviews

There are no reviews yet.

Be the first to review “Doosan DX19 Shop Manual”

Your email address will not be published. Required fields are marked *